Hacker space NOC Electrical
From CCCKC
[edit]
Requirements
- Ventilation/Cooling Requirements
- Dedicated to this room
- must be de-humidified
- Filtering is a bonus.
- Power Distribution (Either)
- Power Squids (under floor)
- Ceiling power drops.
- Power quality (Either)
- Rack mounted PDUs
- 3 Phase conditioned electricity
[edit]
Feb 09 Build out notes
We are limited in power consumption and heat. So we are limited to about 2 or three servers. see CCCKC Intranet for details on services to be offered.
