Hacker space NOC Electrical

From CCCKC

Jump to: navigation, search

Requirements

  • Ventilation/Cooling Requirements
    • Dedicated to this room
    • must be de-humidified
    • Filtering is a bonus.
  • Power Distribution (Either)
    • Power Squids (under floor)
    • Ceiling power drops.
  • Power quality (Either)
    • Rack mounted PDUs
    • 3 Phase conditioned electricity

Feb 09 Build out notes

We are limited in power consumption and heat. So we are limited to about 2 or three servers. see CCCKC Intranet for details on services to be offered.